My comment (in support of NASA) was that an isolated test failure shouldn't be looked upon as a failure of their entire programme. Instead it's actually a signal of progress being made (however slow that progress may be).
There were plenty of isolated testing failures like this (some much worse) leading up to the moon landing.
A much, much, much, much better strategy would have been to keep the Appollo hardware and evolve it. Plan for 1-2 Saturn V flights every year. Use the F1 engine on a smaller vehicle (like Saturn 1B) and use that vehicle as the work horse for both the military and NASA.
This would have allowed them to mass produce the engine, reuse the same pads. It would have given them much more capability compared to Shuttle and it would have been considerably cheaper.
It was bad engineering choices, not simply the budget. They cut the wrong things.
I may just have blindspots in my history knowledge here, but the moon landing was pretty much an unqualified success, no?