Re:Bill and Melinda Gates: America’s Top Farmland Owner
by notJim on Thursday January 14, 2021 @02:15PM
(#25780834)
From wikipedia:
The plant will be able to store solar energy in the form of heated molten salt,
allowing for production of electricity into the night. Phase 1 comes with a
full- load molten salt storage capacity of 3 hours. Noor II, commissioned in 2018,
and Noor III, commissioned in January 2019, store energy for up to eight hours.
The plant will be able to store solar energy in the form of heated molten salt, allowing for production of electricity into the night. Phase 1 comes with a full- load molten salt storage capacity of 3 hours. Noor II, commissioned in 2018, and Noor III, commissioned in January 2019, store energy for up to eight hours.
Very cool.
https://en.wikipedia.org/wiki/Ouarzazate_Solar_Power_Station