We know rockets work inside an envelope we can see, it's a matter of how to do it cheaply. What we know, today, is that fusion doesn't work in envelopes much smaller then ITER.
Besides, ITER is also meant to help develop experience in handling large plasmas for extended periods of time, that knowledge will transfer to other designs.
Also, ITER won't demonstrate anything until 2035. By then, several smaller scale designs would have already demonstrated break even.
Small prototypes don't mean immediate progress in fusion, the original tokamak was hailed as great progress in 1958 and it was less than a metre across.
Until we have perfect understanding of Magnetohydrodynamics and materials science one simply cannot reliably predict the behaviour of completely new devices.
It's like saying a 5nm CPU design is somehow the same as a 32nm CPU, even if they both had the same die size, even those the 32nm versions had far less transistors.
To summarize:
. <-- the point
--> your commentArc is doing what JET and Alcator C-Mod did (with a radius very similar to JET), just with a much more power efficient confinement system, so the input power is lower, and the magnetic field is a factor of 2.6 stronger. The basic physics show that stronger fields actually make the plasma more well behaved, not less, so the major variable vs JET (a proven existing tokamak with Q=0.67) that's changing is not likely to lead to surprising results.
Even the Raptor engine, though it was never widely used, was initially built by the Russians decades ago. The concept is known to work.
Hardware-wise, SpaceX did a great job gathering the best of what had already been done and proven. Friction stir welding? Used to build Delta II, Delta IV, Atlas V, Space Shuttle tank and more. Pintle injectors? Lunar Excursion Module. Semi-balloon tanks? Proven on Atlas I and II, and Centaur. Then, once they had something that flew, and a contract from NASA to keep it flying, they iterated on it to make it reusable. Much like the story of Boeing with the KC-135 and 707, a key early contract was enough to support the program and subsidize further development.
They iterated starting from a LOX/RP-1 rocket engine cycle that has been proven to work and in widespread use for half a century. Fusion is totally different.
Telsa / SpaceX / Elon - focused on ground up physics principals. They said things like, how can we make a better battery pack and will the math then work for a good EV car. They showed to their satisfaction that the answer was yes, and built from there to a degree. Their battery / powertrain work has been consistently good before any of the huge capital efforts, and the path forward was pretty well defined.
Same with their rocket engines. They iterate and qualify pretty quickly.
ITER and these folks are spending billions on what is actually ancient tech with really no realistic (I don't think) path to sustainable commercial power even theoretically in any reasonable time horizon. This is the Space Launch System approach, gear up and go on old tech.
We do need someone in a lab (Tesla / SpaceX style) iterating, and then proving out key physics / components. The problem with ITER, you CANNOT stop funding it, it's just gobbling up all the money because the number of jobs now tied to this - it's a jobs machine basically.
At spaceX it doesn't feel like their are a lot of sacred cows. These maga projects are pure sacred cow it feels like sometime. It's private / personal capital driven.