But they haven't built anything yet. It's fairly easy to design something and show that it's safe. The AP1000 got approval, but the designs turned out to be too difficult to build, with the builders saying that some parts of the design were "unconstructable", resulting them in building their own design instead, which then had to get reapproved.
NuScale's bet is that factory-based construction will drive down the construction cost to the level that it compensates for the lack of scale that the larger reactors' teams used as justification for going really big.
Now, that said, the whole problem is that of scale. There's no real money in building nuclear power plants. It's basically a few fanatics doing it at new and old companies.
If the US would announce a 2T USD new plant budget, there would be competition.
And even then, probably we would need to build a few very similar plants to have some sort of efficient design.
You should check out the recently approved in the US nuclear reactor by NuScale[1]. It is what everyone has been waiting for. A small (60MW electrical output) reactor built in a factory and shipped to the power plant site. This could be a real game changer.
They had to spend $500 million on just paperwork to get it approved, but they did it.
[1]https://www.nuscalepower.com/