IIRC most issues were caused by problems and delays with fuel fabrication, mentioned in my post. And changes in fuel fabrication is one of the main reasons for postponing BN-1200 construction (i.e. it does not make sense to build a reactor, while fuel production line is not ready).
Those things had more downtime due to technical issues than operation time. The issues were indeed so severe, that the follow-up project (BN-1200) required a redesign and was put on hold indefinitely...