News for hackers. Stuff that matters.
Re:Next-Generation IBM POWER10 Processor by jedbrown on Monday August 17, 2020 @11:09AM (#24188002)
It's more appropriate to compare pricing of Tesla with a datacenter-grade CPU like POWER10 (or Epyc/Xeon/etc.).

A64FX (in Fugaku, the current #1 machine on all popular supercomputing benchmarks) has shown that CPUs can compete with top-shelf GPUs on bandwidth and floating point energy efficiency.

Re:Next-Generation IBM POWER10 Processor by dragontamer on Monday August 17, 2020 @11:46AM (#24188315)
Fugaku has 158,976 nodes x2 chips each, or 317,952 A64FX chips.

Summit has 4,608 nodes x 6 GPUs each, or 27,648 V100 GPUs. It also was built back in 2018.

---------

While Fugaku is certainly an interesting design, it seems inevitable that a modern GPU (say A100 Amperes) would crush it in FLOPs. Really, Fugaku's most interesting point is its high rate of HPCG, showing that its interconnect is hugely efficient.

Per-node, Fugaku is weaker. They built an amazing interconnect to compensate for that weakness. Fugaku also is an HBM-based computer, meaning you cannot easily add or remove RAM (like a CPU / GPU team can configure to more, or less RAM by adding sticks).

These are the little differences that make a difference in practicality. But yes, A64FX is certainly an accomplishment, but I wouldn't go so far as to say its proven that CPUs can keep up with GPUs in terms of raw FLOPs.

Re:Next-Generation IBM POWER10 Processor by jedbrown on Monday August 17, 2020 @01:50PM (#24189766)
A100 has a 20% edge on energy efficiency for HPL, along with higher intrinsic latencies. It's also 6-12 months behind A64FX in deployment. https://www.top500.org/lists/green500/2020/06/

HPCG mostly tests memory bandwidth rather than interconnect, but Fugaku does have a great network.

Adding DRAM to a GPU-heavy machine has limited benefit due to the relatively low bandwidth to the device. They're effectively both HBM machines if you need the ~TB bandwidth per device (or per socket).

Normalizing per node (versus per energy or cost) isn't particularly useful unless your software doesn't work well with distributed memory.

Re:Next-Generation IBM POWER10 Processor by dragontamer on Monday August 17, 2020 @02:09PM (#24189986)
> Adding DRAM to a GPU-heavy machine has limited benefit due to the relatively low bandwidth to the device. They're effectively both HBM machines if you need the ~TB bandwidth per device (or per socket).

This POWER10 chip under discussion has 1TB bandwidth to devices with expandable RAM.

Yeah, I didn't think it was possible. But... congrats to IBM for getting this done. Within the context of this hypothetical POWER10, 1TB bandwidth interconnects to expandable RAM is on the table.

Re:Next-Generation IBM POWER10 Processor by jedbrown on Monday August 17, 2020 @04:14PM (#24191484)
It's 410 GB/s peak for DDR5. The "up to 800 GB/s sustained" is for GDDR6 and POWER10 isn't slated to ship until Q4 2021 so it isn't really a direct comparison with hardware that was deployed in 2019.
Re:Next-Generation IBM POWER10 Processor by rbanffy on Monday August 17, 2020 @02:24PM (#24190153)
IIRC, the new memory connection they introduced with the latest POWER9 chips traded bandwidth and physical distance for a bit of latency.
Re:Next-Generation IBM POWER10 Processor by jabl on Tuesday August 18, 2020 @04:03AM (#24196279)
Slides posted earlier in this thread say the OMI (the memory interface) adds about 10ns compared to straight DDR5.