Re:Factorio and Software Engineering
by hackcasual on Sunday August 16, 2020 @07:19PM
(#24182232)
But they stack better in trains. A train load of greens is equivalent to almost 5 train loads of it's precursors
[ Parent
| on HN ]
That's a good point.
300 copper (= 600 copper cables) + 200 iron => 200 green circuits in a stack.
Re:Factorio and Software Engineering
by hackcasual on Monday August 17, 2020 @01:48PM
(#24189729)
Yep, it's one of the reasons smelting where you mine is popular with train based logistics, since that doubles your density