>will only delay the transition to renewables for obvious economic reasons.
If you want more renewables then you need a more flexible grid. All that crappy coal baseload clogging the grid needs to disappear and make space for renewables. Gas plants are cheap to build but expensive to operate. They will be mostly used when there is a temporary shortfall of renewables. They are also necessary for power to gas if you actually want to reach 100% renewables.
If you want more renewables then you need a more flexible grid. All that crappy coal baseload clogging the grid needs to disappear and make space for renewables. Gas plants are cheap to build but expensive to operate. They will be mostly used when there is a temporary shortfall of renewables. They are also necessary for power to gas if you actually want to reach 100% renewables.