Re:Why is the Fessenheim 2 nuclear power plant closing in Fr... by toomuchtodo on Wednesday July 15, 2020 @01:52PM (#23848938)
There will be failures on the way to a fully renewable powered grid. India just turned up a 750MW facility successfully [1]. 70% of Texas coal plants are at risk of decommissioning as early as 2022 due to the amount of solar generation in the pipeline [2]. Spain is years ahead of schedule in coal decommissioning due to low cost renewables and pumped hydro storage capabilities being developed [3]. The UK is rapidly developing HVDC undersea cables to import clean hydro from Denmark and Norway [4]. Australia has over 130GW of renewables projects in the development pipeline (5x greater than the continent's entire fossil generation capacity) [5].

Seven countries are expected to end the use of coal by 2025: Portugal (2021), France (2022), Slovakia (2023), the UK (2024), Ireland (2025) and Italy (2025) (per Europe Beyond Coal)

Politics and entrenched interests will have no choice but to accept market forces. The sun dumps enough power on the Earth in an hour to power all of humanity for a year, and it's mostly free for the taking.

[1] http://ddnews.gov.in/business/pm-modi-dedicate-nation-750-mw...

[2] https://www.solarpowerworldonline.com/2020/07/new-report-fin...

[3] https://english.elpais.com/economy_and_business/2020-06-29/s...

[4] https://electrek.co/2020/07/14/worlds-longest-subsea-power-c...

[5] https://www.pv-magazine-australia.com/2019/10/26/australias-...

Re:Why is the Fessenheim 2 nuclear power plant closing in Fr... by twic on Wednesday July 15, 2020 @02:19PM (#23849365)
> The UK is rapidly developing HVDC undersea cables to import clean hydro from Denmark and Norway

That struck me as odd, because Denmark is flat as a pancake - it's basically an overgrown sandbank laid down by Norway's fjords. But the article explains that the cable will carry power from Norwegian hydro plants, which for some reason comes via Denmark. There is a direct cable from Norway to the UK, but i suppose this adds some redundancy, which is good. And, as the article notes, allows the UK to export surplus power (from wind?) to Denmark.

On Denmark being flat, here is its highest point - note that in the photo, the highest point isn't visible, because it's behind a barn:

https://en.wikipedia.org/wiki/M%C3%B8lleh%C3%B8j

Re:Why is the Fessenheim 2 nuclear power plant closing in Fr... by toomuchtodo on Wednesday July 15, 2020 @02:20PM (#23849381)
> And, as the article notes, allows the UK to export surplus power (from wind?) to Denmark.

Correct. Quite a bit of offshore wind potential Great Britain.

https://www.renewableenergyworld.com/2020/06/12/great-britai...

Re:Why is the Fessenheim 2 nuclear power plant closing in Fr... by LargoLasskhyfv on Friday July 17, 2020 @10:47PM (#23878486)
For some reason could be explained by looking at

[1] https://openinframap.org/#4.88/56.67/8.34/L,P

By going via Denmark the distance under water is shorter. Also continental Europe, mainly Germany and Benelux slurped the power first, so the infrastructures have already been there. Why not use them as much as possible, i guess? Although recently some direct point-to-point has been built.

Re:Why is the Fessenheim 2 nuclear power plant closing in Fr... by steeve on Wednesday July 15, 2020 @02:05PM (#23849140)
"India just turned up a 750MW facility successfully"

That number doesn't say much, since the actual output will be a small percentage of that (15-20%).

Re:Why is the Fessenheim 2 nuclear power plant closing in Fr... by toomuchtodo on Wednesday July 15, 2020 @02:10PM (#23849217)
It's low carbon generation getting built that otherwise would've been gas or coal. India only has about 7GW of nuclear generation capacity (with ~5GW in development), but has a target of 100GW of solar by 2022 (which between cheap labor and cheap hardware, is entirely feasible). Ground mount utility scale solar is very cheap per MWh, and very fast to deploy (years, not decades).