Re:We need to do the math, even on “small” projects
by selectodude on Thursday June 18, 2020 @11:16PM
(#23570594)
I think it's quite the opposite. There is heavy incentive to pick the lowest bidder without any consideration paid to how absurd the bid is, which is where you get these crazy cost overruns. The bid was never doable to begin with.
[ Parent
| on HN ]
Re:We need to do the math, even on “small” projects
by imtringued on Friday June 19, 2020 @07:24AM
(#23573276)
And once there is a cost overrun it's easy to bloat the budget because the government is stuck with the contractor they hired.