Your 269 renewable projects, occupying thousands of times more land space and requiring hundred of times more resources to build, will only produce 3 to 4 times as much at best, while still requiring an equivalent spare capacity (in storage, using unavailable technology, or in gas, coal, ... or nuclear) for times of no wind or no sun.
Renewables are a sham. A waste of money, land and resources. Seriously, I'm quite sure of it now.
From Wikipedia on HPC:
> EDF has negotiated a guaranteed fixed price – a "strike price"– for electricity from Hinkley Point C of £92.50/MWh (in 2012 prices),[26][81] which will be adjusted (linked to inflation) during the construction period and over the subsequent 35 years tariff period. The strike price could fall to £89.50/MWh if a new plant at Sizewell is also approved.[26][81] High consumer prices for energy will hit the poorest consumers hardest according to the Public Accounts Committee.
> One analyst at Liberium Capital described the strike price as 'economically insane' in October 2013: "as far as we can see this makes Hinkley Point the most expensive power station in the world... on a leveraged basis we expect EDF to earn a Return on Equity (ROE) well in excess of 20% and possibly as high as 35%".[98] "Having considered the known terms of the deal, we are flabbergasted that the UK Government has committed future generations of consumers to the costs that will flow from this deal"
> 25 September 2019, EDF announced that the total cost of the power station was likely to rise by up to £2.9bn and the total bill could be more than £22bn
This very much sounds like a waste of money and resources.
https://en.wikipedia.org/wiki/Hinkley_Point_C_nuclear_power_...
more like 10GW
https://assets.publishing.service.gov.uk/government/uploads/...
https://www.world-nuclear.org/information-library/country-pr...
Something to note:
> The UK has 15 reactors generating about 21% of its electricity but almost half of this capacity is to be retired by 2025.
The UK's combined annual wind (40TWh) and solar (14TWh) generation capacity is still less than 3/4 of nuclear (72TWh).
Capacity factor aside, unreliability aside, seasonal variation aside, real word aside... you can argue literally anything.
See the data tables here: https://www.ofgem.gov.uk/data-portal/electricity-generation-...
In 2019 the UK generated 51.04 TWh from nuclear and 76.55 TWh from wind and solar.
There are ~269 renewables projects, roughly 40GW, in the planning stages that will add to that existing renewables capacity. [2] Hydro imports from Scandinavia over an underwater HVDC transmission cable would also be a possibility.
[1] https://www.electricitymap.org/zone/GB?wind=false&solar=fals...
[2] https://www.theguardian.com/business/2020/mar/16/planning-ap...
Note: Edits were made to this comment to the multiplier and the total nuclear generator capacity based on blibble's comment below.