Re:Mist Showers: Sustainable Decadence? (2019)
by fulafel on Thursday June 04, 2020 @02:23AM
(#23413215)
I'm not sure if we are reading the same sources. The smaller ~1 GW BWR projects (using eg VVER-1000) have been completed with much smaller delays and overruns in recent years, with construction start to operation times around 5 years.
Really, the problem isn't any specific technology, but rather the fact that any industry where projects cost a billion dollars apiece, is going to result in a natural monopoly/oligopoly, which creates perverse incentives.
The renewable energy sources you think of when you think of "renewable energy", aren't lower-overhead because of what's required to build them. They're lower-overhead because they're often built/sold as individual interchangable units that can be purchased on the open market at different times from many different companies; which creates an efficient, liquid market for such devices.
Contrast with e.g. a hydro dam. Hydro power is also renewable energy! But a dam is just as large an infrastructure project as a nuclear plant; and so dam-builders and dam-buyers form just as small a market; and so said market is just as fraught with cronyist back-room dealings; and so the market ends up just as inefficient as nuclear, or coal, or oil-and-gas, or any other cartel-driven business.