News for hackers. Stuff that matters.
Re:$50M worth of Tesla equipment sits unused in a Wheatfield... by walrus01 on Wednesday March 04, 2020 @11:56AM (#22485402)
One of the problems with entirely ceasing production of a category of incredibly complex military system is that the engineering knowledge to build it retires, goes elsewhere or becomes unavailable.

The UK faced a number of problems with their domestic construction of the Astute class nuclear attack submarines, as they had not built a nuclear sub in more than 15 years. The institutional knowledge of how to build such a thing had become scarce or retired.

Re:$50M worth of Tesla equipment sits unused in a Wheatfield... by manquer on Wednesday March 04, 2020 @08:18PM (#22490022)
you are not wrong.. However we have lost a lot of such knowledge from the vagaries of the Space programs, civilian nuclear reactors, Tech in many ways far more important. It seems wrong tanks and nuclear subs should get better treatment than space.
Re:$50M worth of Tesla equipment sits unused in a Wheatfield... by heavenlyblue on Wednesday March 04, 2020 @12:02PM (#22485452)
Why not instead build them slowly enough so that the last submarine of class n-1 would be finished just before/after beginning of the build of the first submarine of class n?
Re:$50M worth of Tesla equipment sits unused in a Wheatfield... by Robotbeat on Wednesday March 04, 2020 @12:19PM (#22485611)
Because that makes the costs much higher. At some point, the unit costs are dominated by fixed costs, so producing 1 a year costs 10 times as much per unit as producing, say, 15 per year.