News for hackers. Stuff that matters.
Re:Boeing to Suspend 737 Max Production in January by Xixi on Monday December 16, 2019 @08:58PM (#21809761)
A billion dollar would be dirt cheap for a clean sheet design. The MAX program (including its engine) is estimated at $2B-3B. For a clean sheet successor a safe assumption would be 7 to 8 years to EIS and $15B in investment.
Re:Boeing to Suspend 737 Max Production in January by Aloha on Monday December 16, 2019 @09:46PM (#21810049)
I assumed it was north of 5b, but I was on my phone at the time and didnt look up costs.