News for hackers. Stuff that matters.
Re:The Next Nuclear Plants Will Be Smaller and Safer by boomboomsubban on Friday December 13, 2019 @11:43PM (#21787868)
I imagine you can find all sorts of numbers in their 12000 page report to the NRC, I assume located here

https://www.nrc.gov/reactors/new-reactors/design-cert/nuscal...

Re:The Next Nuclear Plants Will Be Smaller and Safer by Animats on Saturday December 14, 2019 @12:38AM (#21788019)
Yes, and this is the main document to read.[1]

There's some hand-waving on safety issues in Table 1.9-2. NuScale passes the buck on flooding issues to the plant owner. Also, there's some hand-waving on software safety issues: "The NuScale design applies RG 1.152, Revision 3 and IEEE Std. 7-4.3.2-2003 that it endorses. For RG 1.168, the requirements of IEEE 1012-2004 are tailored to the NuScale I&C development lifecycle, which is different from the conceptual waterfall lifecycle in IEEE 1012-2004. The applicable tasks from IEEE 1012-2004 to the I&C development are mapped. Some administrative mandatory requirements in the standard conflict with established Engineering or QA documentation requirements. The requirements of IEEE 1028-2008 are tailored to the NuScale I&C development lifecycle." This may mean "We use Agile and your outdated rules don't apply".

The key concept is that, since these plants are passively cooled and don't require pumps for cooling, many of the concerns about keeping cooling water flowing to prevent a meltdown don't apply. "For the NuScale design, the safety analysis shows that core damage does not occur during any design basis event.", says the application. What could possibly go wrong?

A big concern is that NuScale proposes to put up to 12 reactors in one connected pool. I haven't found the part yet where they discuss what happens if one leaks and contaminates the whole pool. Or the pool springs a leak and drains into the ground.

These are not small plants. A 12-unit plant is 720MW of electrical power, so it's getting close to a typical gigawatt sized plant. More small units, instead of one big one.

The history of power reactor meltdown incidents is roughly as follows:

- Three Mile Island - meltdown, big containment vessel, fully contained, expensive but not hazardous.

- Chernobyl - fire, meltdown, no containment vessel, radioactive material dispersed over large area.

- Fukishima - meltdowns, undersized containment vessels breached, radioactive material dispersed over moderate sized area.

A certain amount of skepticism about designs that "don't need" a big containment vessel is perhaps justified.

[1] https://www.nrc.gov/docs/ML1924/ML19241A398.pdf

Re:The Next Nuclear Plants Will Be Smaller and Safer by xorfish on Saturday December 14, 2019 @01:52AM (#21788200)
There are designs that don't need a large containment vessel because they operate at normal pressure and there is no water that might expand by a factpr of 1000.

Look at the IMSR.

Re:The Next Nuclear Plants Will Be Smaller and Safer by Animats on Saturday December 14, 2019 @03:21AM (#21788440)
NuScale is a pressurized water reactor whose containment sits in a water-filled pit.
Re:The Next Nuclear Plants Will Be Smaller and Safer by andromeduck on Saturday December 14, 2019 @04:53AM (#21788686)
Isn't the pool secondary containment so leaking into the pool is bad but not really any different than if primary containment failed for any other plant.

You can find leaks in pools pretty easy by using a double lining and distributed sensors or in closed environments like this, by measuring net flows and looking out for any net change in volume.

Re:The Next Nuclear Plants Will Be Smaller and Safer by baking on Saturday December 14, 2019 @08:53AM (#21789487)
The pool is for passive secondary cooling if the primary fails. It is outside the containment and is intended to boil off over 30 days if there is a complete blackout. 30 days is all you need for the decay heat because after that air cooling is sufficient.
Re:The Next Nuclear Plants Will Be Smaller and Safer by Animats on Saturday December 14, 2019 @01:23PM (#21791105)
Not 30 days. 72 hours. "Water inventory in the reactor pool is adequate to cool the NPMs for at least 72 hours without adding water." NRC filing [1], page 41, bottom of page.

A NuScale press release does say that. "The system is capable of providing 30 days of cooling without adding water to the pool."[2]

The web site hype goes even further: "Should it become necessary, NuScale’s SMR shuts itself down and self-cools for an indefinite period of time, with no operator action required, no additional water, and no AC or DC power needed."[3] But that's not what the NRC filing says.

Looks like they make bigger claims when they think they can get away with it.

[1] https://www.nrc.gov/docs/ML1924/ML19241A398.pdf [2] https://newsroom.nuscalepower.com/sites/nuscalepower.newshq.... [3] https://www.nuscalepower.com/

Re:The Next Nuclear Plants Will Be Smaller and Safer by baking on Saturday December 14, 2019 @06:14PM (#21793040)
That accusation seems a little extreme.

The 30 day claim was published in January 2012 in response to the Fukushima accident: https://www.tandfonline.com/doi/abs/10.13182/NT12-A13556

Also, in "NuScale Technical Report Long-Term Cooling Methodology, dated January 2017, TR-0916-51299" (https://www.nrc.gov/docs/ML1835/ML18355A973.pdf)

"5.3.4 Long Term Cooling Evaluation Period LTC analysis is limited to three days. This timeframe is considered acceptable because: (1) the most severe conditions will have been captured within the 72 hour window analyzed, and any conditions that could reasonably be expected to occur beyond this time period are thus bounded by the 72 hour calculation, and (2) after 72 hours, operator actions can be credited. When realistic initial operating levels, temperatures, and decay heat are considered, the scope of the LTC analyses bound the expected level decrease in the reactor pool ultimate heat sink over 30 days, for up to twelve modules transferring decay and residual heat to the reactor pool."

I read this as that they ran a number of scenarios with extreme initial conditions and at the end of three days all operating characteristics were effectively the same as with typical starting conditions and therefore they expected the 30 day simulations would give the same result no matter what the initial conditions were. I don't think they are hiding anything here.

Re:The Next Nuclear Plants Will Be Smaller and Safer by Animats on Sunday December 15, 2019 @02:38AM (#21795005)
That's so heavily censored it's hard to tell anything from it.
Re:The Next Nuclear Plants Will Be Smaller and Safer by blattimwind on Saturday December 14, 2019 @11:16AM (#21790217)
> "For the NuScale design, the safety analysis shows that core damage does not occur during any design basis event.", says the application. What could possibly go wrong?

The thing with nuclear reactors is that this sentence was thought to be true for most designs, including those that failed to varying degrees (RBMK, GE BWR, B&W PWR).

Re:The Next Nuclear Plants Will Be Smaller and Safer by jason0597 on Saturday December 14, 2019 @11:49AM (#21790398)
You're going to have to show the reports that said such things ("core damage does not occur during any design basis event") for those old designs
Re:The Next Nuclear Plants Will Be Smaller and Safer by blattimwind on Saturday December 14, 2019 @12:42PM (#21790781)
It's more or less a tautology, because the most severe accident the reactor is thought to withstand is the design-basis event. AFAIK in the instances of Fukushima and Chernobyl/RBMK it was later thought that the design basis was simply incorrect.
Re:The Next Nuclear Plants Will Be Smaller and Safer by mdorazio on Saturday December 14, 2019 @09:27AM (#21789640)
Thanks for this link. I've only read a few sections, but I can't find any cost info at all. Also they're not really saying anything about waste management that's useful. Summary: "The SRWS processes solid waste by dewatering, decontaminating, surveying, sorting, and classifying solid waste for storage and eventual shipment to licensed offsite facilities." (basically the same process with the same issues I have with "regular" nuclear plants). They do answer my water concerns, though - looks like no external cooling water is needed in normal operation, but their design is food susceptible so it needs to be built in places that cannot flood.