Re:Why Are Canadian Construction Costs So High? (2018)
by frandroid on Tuesday November 26, 2019 @12:50PM
(#21640689)
> the dollar store has agreed on a level of quality
The problem is that "agree on a level" and "lowest cost" are fundamentally opposite goals which require constant outside monitoring.
The reality is for big projects quality should always be part of the contract. Use substandard quality materials and the whole contract is void.