Re:‘This Did Not Go Well’: Inside PG&E’s Blackout Control Room by rayiner on Saturday October 12, 2019 @10:26PM (#21237884)
Given how California’s HSR project recently exploded due to run away costs, calling the concern about the state take over more things “fear mongering” is pretty dense.
Re:‘This Did Not Go Well’: Inside PG&E’s Blackout Control Room by inferiorhuman on Saturday October 12, 2019 @10:48PM (#21237990)
CAHSR died the death of a thousand paper cuts (e.g. SF and south bay routing, grade separation, signalling, trump). All of that created an untenable situation.

The closest equivalent with municipal power is the gobs of money PG&E has spent trying to kill local and statewide public power legislation.

Re:‘This Did Not Go Well’: Inside PG&E’s Blackout Control Room by dragonwriter on Saturday October 12, 2019 @11:45PM (#21238225)
> CAHSR died the death of a thousand paper cuts

CAHSR is surprisingly alive and active for something that died.

Re:‘This Did Not Go Well’: Inside PG&E’s Blackout Control Room by selectodude on Sunday October 13, 2019 @02:21AM (#21238708)
It exists, and they’re building, but it’s only linking the powerhouse cities of Merced, Fresno and Bakersfield. So I’m sure it’ll be packed 7 days per week.
Re:‘This Did Not Go Well’: Inside PG&E’s Blackout Control Room by rayiner on Sunday October 13, 2019 @01:06PM (#21241429)
It’ll remain a hilarious monument to the state government’s incompetence, right in the heart of a region that “voted for the other guy.”
Re:‘This Did Not Go Well’: Inside PG&E’s Blackout Control Room by rayiner on Sunday October 13, 2019 @01:05PM (#21241419)
Routing, grade separation, and signaling are things any train system must deal with. The lesson from CAHSR is that the California government was too incompetent to be able to handle something that many governments around the world handle just fine.

As to Trump—CAHSR had already failed by the time Trump took office. He simply demanded the federal government’s money back.

Re:‘This Did Not Go Well’: Inside PG&E’s Blackout Control Room by inferiorhuman on Sunday October 13, 2019 @08:01PM (#21244194)
The lesson from CAHSR is that the California government was too incompetent to be able to handle something that many governments around the world handle just fine.

How do you get incompetence from being sued at every turn by people trying to micromanage the CAHSR project? The trump approach of ruling by fiat doesn't work in the real world.

Re:‘This Did Not Go Well’: Inside PG&E’s Blackout Control Room by masonic on Sunday October 13, 2019 @03:47AM (#21239063)
In one comment chain, we have Regan (sic) blamed for "privatizing" CA utilities and Trump blamed for CAHSR.
Re:‘This Did Not Go Well’: Inside PG&E’s Blackout Control Room by inferiorhuman on Sunday October 13, 2019 @05:08AM (#21239351)
In one comment chain, we have Regan (sic) blamed for "privatizing" CA utilities and Trump blamed for CAHSR.

Whether or not you agree with his actions Trump absolutely tried to kill CAHSR.

https://www.latimes.com/local/lanow/la-me-high-speed-rail-20...

Re:‘This Did Not Go Well’: Inside PG&E’s Blackout Control Room by masonic on Sunday October 13, 2019 @08:21PM (#21244270)
And within this article alone, you find specific references about how CAHSR failed to comply with the conditions of the funding:

'Ronald Batory, (the Obama Administration's) chief of the Federal Railroad Administration, the transportation agency that made the grants in 2009 and 2010, laid out a lengthy legal argument Tuesday for why the state was out of compliance with the grant agreement. Batory said in a three-page letter to California High-Speed Rail Authority Chief Executive Brian Kelly that the state “has materially failed to comply with the terms of the agreement and has failed to make reasonable progress on the project.”

Batory alleged that the state had failed to spend required matching funds, falling short by $100 million as of December. He argued that it will fail to complete the Central Valley construction by a 2022 deadline required by the grant. Batory also said the state has not submitted required financial information — such as reports on what has been delivered to date — that would allow federal regulators to oversee the grants. It also has failed to take corrective actions after regulators raised concerns in 2017 and 2018.'

Re:‘This Did Not Go Well’: Inside PG&E’s Blackout Control Room by rayiner on Sunday October 13, 2019 @01:08PM (#21241444)
Trump didn’t derail the project as originally envisioned. He tried to kill it after the governor declared that the project that had originally been pitched to the federal government had become infeasable.
Re:‘This Did Not Go Well’: Inside PG&E’s Blackout Control Room by inferiorhuman on Sunday October 13, 2019 @08:02PM (#21244198)
Trump didn’t derail the project as originally envisioned. He tried to kill it after the governor declared that the project that had originally been pitched to the federal government had become infeasable.

So what you're saying is that trump is trying to kill CAHSR? Got it.

Re:‘This Did Not Go Well’: Inside PG&E’s Blackout Control Room by masonic on Sunday October 13, 2019 @08:26PM (#21244299)

  trump is trying to kill CAHSR?
No. CAHSR is probably dying but due to CA's own lies and ineptitude.

All the Trump administration did is say, "you were promised funding conditional on it being spent on X, Y, and Z. Instead, CA spent that money on the infrastructure equivalent of hookers and blow[0]. Therefore, we are simply cancelling the funding per the agreement and the law because essentially none went to X, Y, or Z."

CAHSR is free to proceed (as far as the Administration is concerned) however they want with their own funds and the promised investor funds. In other words, pay for your own hookers and blow.

[0] 'In one especially egregious case, in 2017, the CHSRA hired an external consultant to check the work of Parsons Brinckerhoff (now WSP USA), which had been paid $666 million for engineering consulting. The external consultant found that the CHSRA had not received finished work for 145 of 184 tasks that Parsons Brinckerhoff had called “complete.”'

https://www.city-journal.org/californias-high-speed-rail-pro...