Re:China laying tracks for 1,000km/h maglev trains
by MrFlynn on Friday October 04, 2019 @02:18AM
(#21155266)
And the current estimated cost of that hsr system exceeds the estimated cost of the entire 520 mi (840 km) phase 1 system in California. Imagine scaling the cost of a similar design to travel the distance from SF to LA, ignoring the fact that the Japanese tend to build these grand infrastructure projects far more cost effectively than we do.
[ Parent
| on HN ]
There are no comments on this comment yet.