Re:Hinkley Point C nuclear plant to run £2.9bn over budget
by thrillgore on Wednesday September 25, 2019 @07:39AM
(#21069724)
False. In 2007 construction on Watts Bar unit 2 resumed after years of waiting. Similar work began on Vogtle around the same time.
Stop blaming Chernobyl when the truth is clear: the costs of retrofitting most reactor designs to absolve fault tolerance make them inherent unprofitable compared to wind, geothermal, and solar.
Stop blaming Chernobyl when the truth is clear: the costs of retrofitting most reactor designs to absolve fault tolerance make them inherent unprofitable compared to wind, geothermal, and solar.