News for hackers. Stuff that matters.
Re:Shipping wind turbines is not a breeze by hannob on Thursday August 29, 2019 @03:45AM (#20827550)
Both seem pretty challenging.

Building "on-site" is tough because the "sites" are by definition scattered around, often in the countrysite with little infrastructure. On one site you only have a handful of turbines to install.

Flying large objects is challenging. There have been attempts to transport large cargo with zeppelins, but it's more of a failure story of German industry politics [1].

[1] https://en.wikipedia.org/wiki/CargoLifter

There are no comments on this comment yet.