Re:Shipping wind turbines is not a breeze
by hannob on Thursday August 29, 2019 @03:45AM
(#20827550)
Both seem pretty challenging.
Building "on-site" is tough because the "sites" are by definition scattered around, often in the countrysite with little infrastructure. On one site you only have a handful of turbines to install.
Flying large objects is challenging.
There have been attempts to transport large cargo with zeppelins, but it's more of a failure story of German industry politics [1].
Building "on-site" is tough because the "sites" are by definition scattered around, often in the countrysite with little infrastructure. On one site you only have a handful of turbines to install.
Flying large objects is challenging. There have been attempts to transport large cargo with zeppelins, but it's more of a failure story of German industry politics [1].
[1] https://en.wikipedia.org/wiki/CargoLifter