News for hackers. Stuff that matters.
Re:Improving Workflow Efficiency: A Case Study on Target Cor... by goohex on Sunday July 14, 2019 @12:03AM (#20431581)
The buildings are 4 blocks apart but there aren't many buildings the same height as those two between them (maybe the Radisson and Marriot). Obviously some of the more significant buildings on the Minneapolis skyline. The answer is obvious.

Gondola.

https://www.vice.com/en_us/article/a3ye7g/boston-toronto-edm...

https://www.curbed.com/2017/9/21/16340394/urban-gondolas-cab...

http://www.bbc.com/future/gallery/20190103-the-rise-of-the-u...

Re:Improving Workflow Efficiency: A Case Study on Target Cor... by loukrazy on Sunday July 14, 2019 @11:12AM (#20433834)
At work we joke about zip lines between buildings
Re:Improving Workflow Efficiency: A Case Study on Target Cor... by justborn on Sunday July 14, 2019 @12:12AM (#20431602)
Would work well in the winter!