Re:The Boring Company will develop an underground “people mo...
by the-dude on Wednesday May 29, 2019 @04:09PM
(#20044794)
Are you sure about that? Because I have never heard about a tunnel project which has been 'upgraded' this way ever.
And if I start to think about the practical problems, like breaking up part of the tunnel before widening it, it quickly seems like building a new one might be more efficient.
Re:The Boring Company will develop an underground “people mo...
by Retric on Thursday May 30, 2019 @10:02AM
(#20051187)
Assuming the tunnel is not in use then yes.
Here the are filling the tunnel and using a TBM. https://www.newcivilengineer.com/farnworth-tunnel-widening/1...
Widening an existing tunnel without interrupting traffic is still possible like: https://www.rocksoil.com/pdf/233_r.pdf. Though with increased costs.
However, this changes for under sea tunnels which are segments placed down and thus can’t really be widened.
Re:The Boring Company will develop an underground “people mo...
by NeedMoreTea on Wednesday May 29, 2019 @04:19PM
(#20044905)
Almost every tunnel has a lining that makes widening prohibitive. Which is why the London Underground is forever stuck with small tunnels on the original lines.
Re:The Boring Company will develop an underground “people mo...
by Retric on Thursday May 30, 2019 @10:14AM
(#20051314)
A larger issue is the underground is in use forcing you to do something like: www.rocksoil.com/pdf/233_r.pdf
That and the cost vs benefit is not considered worth it.
In hard rock you can use drilling and blasting across long sections rather than just the leading edge. Alternatively, a TBM needs to remove significantly less material.