Re:The Anhei tokamak is first in the world to generate 100M ...
by pfdietz on Monday April 29, 2019 @05:56PM
(#19782960)
MIT's ARC design has an estimated cost of $29/W(e), an order of magnitude higher than PV.
Each 170 MW(e) ARC reactor will use 40% of the world's annual production of beryllium.
The "easily replaceable" in your description is quite a stretch. The replacement will be much more demanding than the replacement of fuel elements in a fission reactor. In the latter, the radioactivity is almost entirely contained inside the fuel elements, and they are simply transfered, as fuel bundles, to a cooling pool.
But the 86 tonne reactor vessel in ARC will have been permeated with tritium, and the tungsten will have been loaded with activation products by the intense neutron bombardment. It will be much larger than the rather compact arrangement of fuel rods that makes up a PWR core (about 165 tonnes of fuel, including structural material, in a typical 1000 MW(e) power reactor, which has nearly six times the power output of the ARC design.) The reactor vessel will take more space to remove. And then it will have to be crushed. The workspace in which this happens will become inaccessible to people, as it will become contaminated with tritium and radioactive tungsten dust. The overall volume inside the reactor building where all this happens will be very large, making the building expensive.
Each 170 MW(e) ARC reactor will use 40% of the world's annual production of beryllium.
The "easily replaceable" in your description is quite a stretch. The replacement will be much more demanding than the replacement of fuel elements in a fission reactor. In the latter, the radioactivity is almost entirely contained inside the fuel elements, and they are simply transfered, as fuel bundles, to a cooling pool.
But the 86 tonne reactor vessel in ARC will have been permeated with tritium, and the tungsten will have been loaded with activation products by the intense neutron bombardment. It will be much larger than the rather compact arrangement of fuel rods that makes up a PWR core (about 165 tonnes of fuel, including structural material, in a typical 1000 MW(e) power reactor, which has nearly six times the power output of the ARC design.) The reactor vessel will take more space to remove. And then it will have to be crushed. The workspace in which this happens will become inaccessible to people, as it will become contaminated with tritium and radioactive tungsten dust. The overall volume inside the reactor building where all this happens will be very large, making the building expensive.