Re:Sydney Opal Tower: Thousands evacuated after 'crack' by cronix on Monday December 24, 2018 @05:08PM (#18754541)
I don't track it, but last I heard there was a proposal that would cost ~$100M to drive micropilons down to bedrock, which is what should have been mandated in the main design to begin with. https://www.sfchronicle.com/bayarea/article/Millennium-Tower...

Some windows are starting to crack as well. https://sf.curbed.com/2018/9/7/17829328/millennium-tower-win...

Re:Sydney Opal Tower: Thousands evacuated after 'crack' by HillaryBriss on Monday December 24, 2018 @05:58PM (#18754746)
I recall early stories about Millennium Tower and the builder basically claiming, through a law firm, that it was a normal amount of settling and everything was fine. Nothing to see here....

And I bet the same sort of response will come from the builder of Opal Tower in Sydney.

Re:Sydney Opal Tower: Thousands evacuated after 'crack' by TheGrassyKnoll on Monday December 24, 2018 @06:34PM (#18754895)
Millennium Tower will be a multi-decade lawyer-fest. At least four or five parties will be suing each other: The designers, the builders, the city, the apartment owners, insurance companies and probably the neighboring building owners. What a mess.
Re:Sydney Opal Tower: Thousands evacuated after 'crack' by samstave on Monday December 24, 2018 @06:25PM (#18754854)
Here is my personal opinion on the reason why it was thought to be a reasonable amount of settling: that they were looking at simply the individual millenium towers' effect on the overall area -- but with the addition of the transbay terminal next door - the major excavation which occured with that - then the new load of the salesforce tower and the transbay terminal (which also had been closed due to cracking and settling issues and needs to be jacked up -- I think that whole lot of struct/civ engineers are at fault of being short-sighted about the surrounding load impact on the greater financial district and the standards which were previously thought to be adequate.

So - you have the millenium tower, which was completed prior to any of these ancillary loads were put on the area - but is effectively being squeezed out and squished, and even the most micro-shifts in the foundations of Millenium Tower will be amplified by its mass+height -- but as it was already into a settled-ish position, its now getting worse after its' settling is further distressed due to even a millimeter shift in the lateral load due to compression from and settling of the new towers/terminal....

Re:Sydney Opal Tower: Thousands evacuated after 'crack' by twblalock on Monday December 24, 2018 @06:12PM (#18754803)
That's always how it starts, and it always ends with the developer, architect, builder, residents, and local government suing each other for years on end.
Re:Sydney Opal Tower: Thousands evacuated after 'crack' by sagarm on Tuesday December 25, 2018 @01:39AM (#18756290)
The window crack discovered in September is believed to be caused by an external impact: https://www.sfchronicle.com/bayarea/article/Something-hit-Mi...

There was another one discovered in late October, but I haven't seen any updates on that one.