Re:REST and long-running jobs (2014)
by geezerjay on Saturday December 01, 2018 @02:06PM
(#18578284)
> Because your storage requirements would grow indefinitely as you would need to store a record for every task ever performed.
The only info that needs to be stored is the ID of the finished task. If, say, the ID is expressed as a GUID then we're talking about 4 ints or 2 longs worth of data.
Even so, these records are supposed to be garbage collected.
The only info that needs to be stored is the ID of the finished task. If, say, the ID is expressed as a GUID then we're talking about 4 ints or 2 longs worth of data.
Even so, these records are supposed to be garbage collected.