Re:Boring Co. Drops LA Westside Tunnel Plan by Anechoic on Wednesday November 28, 2018 @09:41AM (#18551778)
Which is the point of an environmental assessment: to look at the benefits and cost to the environment and document the net result.

This isn’t about declaring the project a hazard to the environment, this is skipping the process to determine if it is or isn’t a net good.

Re:Boring Co. Drops LA Westside Tunnel Plan by zebrafish on Wednesday November 28, 2018 @09:52AM (#18551908)
Who foots the bill for such an assessment?
Re:Boring Co. Drops LA Westside Tunnel Plan by dawnerd on Wednesday November 28, 2018 @10:06AM (#18552065)
Whoever is paying for the project. The same as who pays for all the permits and inspections.
Re:Boring Co. Drops LA Westside Tunnel Plan by zebrafish on Wednesday November 28, 2018 @10:22AM (#18552210)
I would think that's the reason why Boring Co. cancelled the project then. They probably need to get some "MVP" tunnels up and running as soon and as cheaply as possible.