Re:PG&E stock plunged 32% after it disclosed a possible link...
by openforce on Thursday November 15, 2018 @12:49PM
(#18461462)
That might not work for already existing constructions.
The system can be designed to not add to the fire, we can possibly add this to the already existing power infrastructure.
This is a solvable problem.
Your system will just let debris build up even longer, leading to even bigger fires.