News for hackers. Stuff that matters.
Re:After 60 Years, I-95 Is Complete by bonzini on Monday August 20, 2018 @03:32PM (#17803104)
In Europe most high speed rails use dedicated tracks. For example, tracks for high speed trains are welded together, unlike tracks for slower trains. Instead of leaving a small gaps along the track, high speed tracks deal with thermal expansion by pre-stressing the tracks with hydraulic tensors [1] as they are welded (so high speed trains have no too-toom-too-toom :-))

[1] https://en.m.wikipedia.org/wiki/Rail_stressing

Re:After 60 Years, I-95 Is Complete by tuukkah on Monday August 20, 2018 @04:24PM (#17803610)
It seems most tracks today are welded for less maintenance: https://en.m.wikipedia.org/wiki/Track_(rail_transport)#Conti...
Re:After 60 Years, I-95 Is Complete by rootusrootus on Monday August 20, 2018 @04:25PM (#17803623)
AFAIK basically all new rail installations, even freight, are continuous rail. At least in the US. Been that way for quite a while now.