Re:The Dangers of Train Yards, Through the Eyes of Railroad ... by Symbiote on Tuesday July 03, 2018 @08:23PM (#17454575)
"Shortly after 08:00 hrs on 8 November 2010, a passenger train running from London Charing Cross to Hastings failed to stop at Stonegate station in East Sussex. The train ran for a further 2.45 miles (3.94 km) with the emergency brake applied, passing the level crossing at Crowhurst Bridge before coming to a stop 3.22 miles (5.18 km) after first applying the brakes."

There's a whole sequence of events behind this, from the work to remove slippery leaves from rails, to the sand applied during braking if wheels are slipping, to the IT systems and management processes identifying why the train didn't have any sand. It's a fascinating 151 page report.

https://www.gov.uk/raib-reports/station-overrun-incident-at-... (PDF report linked at the bottom).

Re:The Dangers of Train Yards, Through the Eyes of Railroad ... by sandworm101 on Wednesday July 04, 2018 @07:47AM (#17456664)
It was going far faster than 5mph. 5mph is little more than walking pace.
Re:The Dangers of Train Yards, Through the Eyes of Railroad ... by Symbiote on Wednesday July 04, 2018 @09:22AM (#17457113)
True, but the last part of the graph shows what I think is fairly normal braking from 24mph to 0.

Counting pixels, the distance covered from 10mph to zero is about 350 feet. With this distance for a lightly loaded passenger train, 1000 feet doesn't seem impossible or even unreasonable for a heavy freight train at 5mph.