Re:Elon Musk’s Boring Co. Wins Chicago Airport High-Speed Tr...
by Someone1234 on Thursday June 14, 2018 @09:59AM
(#17311701)
Aren't tunnels the size that they are to allow evacuation during emergencies and or to lower the pressure wave forming in front of a fast moving train (i.e. reduce drag)?
Re:Elon Musk’s Boring Co. Wins Chicago Airport High-Speed Tr...
by Brakenshire on Thursday June 14, 2018 @09:55AM
(#17311674)
Don't you need wide tunnels to fit normal trains, let alone high speed trains, because they operate on a higher gauge? I know in London the new Crossrail tunnels have been deliberately made a lot wider than the existing Underground tunnels, because that allows normal trains to run through it. The Underground trains are narrow-gauge light-rail.
Re:Elon Musk’s Boring Co. Wins Chicago Airport High-Speed Tr...
by JoeSmithson on Thursday June 14, 2018 @10:36AM
(#17312001)
Not just Crossrail, even the new tube lines, such as the Northern Line Extension to Battersea are dug much wider than the old tunnels they connect up to. Obviously they carry the same trains as the rest of the line.
The narrowness of the old tunnels is a constant hurdle to improving the tube.
Re:Elon Musk’s Boring Co. Wins Chicago Airport High-Speed Tr...
by KJKingJ on Thursday June 14, 2018 @10:47AM
(#17312107)
Indeed, wider tunnels make maintenance much easier, and also allow evacuation of the train via the regular side doors rather than through the cab door.
Re:Elon Musk’s Boring Co. Wins Chicago Airport High-Speed Tr...
by Symbiote on Thursday June 14, 2018 @12:19PM
(#17312760)
> The Underground trains are narrow-gauge light-rail.
No, they're standard gauge heavy rail; in some places the track is shared with ordinary passenger trains. The older tunnels just have very tight clearance.
You may mean the structure gauge, which is the clearance for tunnels, platforms and so on. That is normal-rail for Crossrail.
I believe this accounts for most of their estimated speed/cost advantage - dig thinner tunnels and move less dirt. They also seem to be coupling that with more continuous tunneling and less labor.
As far as I know, they're doing this with existing tunnel boring machines, just used differently.
Volume = pi * radius^2 * length