Re:Using Flywheel Batteries to Charge Electric Vehicles in T...
by lb1lf on Monday May 14, 2018 @05:20PM
(#17069566)
-We're about to try out the same idea locally, on a larger scale - ferries are about to go electric, the grid is not stiff enough to handle the peak load (4.7MW for 5 minutes every 30 minutes) and hence bunkers (for lack of a better term) containing tons and tons of li-ion batteries are needed to make for a sustainable draw from the grid.
The battery storage facilities won't win any architectural awards as they are currently envisioned, but I can't wait to see whether this will actually work reliably; our first few attempts at electric ferries had some teething problems, mostly with the charge process taking too long to establish. The ferries run on a tight schedule; hence charge time dropped significantly as establishment was slow, and ferry batteries slowly depleted over the course of the day.
Anyway - 4.7MW translates into some quite massive shore power connectors, and they need to mate quickly and reliably - and when the weather gets rough, everything in the surrounding environment will be soaked in salt water. Interesting times.
The battery storage facilities won't win any architectural awards as they are currently envisioned, but I can't wait to see whether this will actually work reliably; our first few attempts at electric ferries had some teething problems, mostly with the charge process taking too long to establish. The ferries run on a tight schedule; hence charge time dropped significantly as establishment was slow, and ferry batteries slowly depleted over the course of the day.
Anyway - 4.7MW translates into some quite massive shore power connectors, and they need to mate quickly and reliably - and when the weather gets rough, everything in the surrounding environment will be soaked in salt water. Interesting times.