Re:How can I tell clients that quotes will never be accurate?
by wccrawford on Thursday September 16, 2010 @04:40PM
(#1699076)
Don't give them a bad quote. Ever.
Sometimes that means over-quoting. Sometimes that means eating the loss.
And sometimes that means quoting by the hour, instead of by the project. Clients generally don't like the idea when they first hear it, but it allows them the most flexibility, since they can make changes to the specifications without signing another contract for every change.
Sometimes that means over-quoting. Sometimes that means eating the loss.
And sometimes that means quoting by the hour, instead of by the project. Clients generally don't like the idea when they first hear it, but it allows them the most flexibility, since they can make changes to the specifications without signing another contract for every change.