Re:Continuing frequency deviation in the Continental Europea...
by mrweasel on Wednesday March 07, 2018 @07:27AM
(#16535905)
I worked on software for the Danish energy grid 10 years ago, so my information may be a little outdated. There is actually a connection now, or at least it's planned, but the grid was split simply due to historical reasons.
The Jylland-Fyn grid and Sjælland grid was developed in parallel so we ended up with a grid containing 400kV and 50kV cables West of Store Bælt and 60kV East of Store Bælt.
The Jylland-Fyn grid and Sjælland grid was developed in parallel so we ended up with a grid containing 400kV and 50kV cables West of Store Bælt and 60kV East of Store Bælt.