Re:Scotland’s floating wind farm is showing how powerful off...
by cbcoutinho on Monday March 05, 2018 @02:12AM
(#16519338)
Maintenance does incur planned downtime on a power plant, but those things can be planned for when there isn't much energy usage throughout the year. In colder climates that's usually in the spring/summer. If a plant goes out for two weeks every year for maintenance, that's not a big problem. A wind farm on the other hand has a much lower load factor (UK offshore is around 30% [0]), and that load capacity isn't planned at all. You might get 30% on average per year, but that daily capacity fluctuates throughout the year - that's what I mean about fluctuating capacity.
[0] https://www.gov.uk/government/statistics/renewable-sources-o...
As I understood the term the capacity factor is the percentage of time the plant is generating power. All plants have periods of maintenance and other "down times" which means they don't achieve 100% capacity. I would expect to use that number like this:
Given a 30MW plant with a 50% capacity factor measured for the year, I would consider it to provide 30MW x 180 x 24 or 129,600 MWh of generating capacity. Two plants with a 50% capacity factor would give you coverage at their rated power all year only if they never overlapped in their down time. So if I was working the issue operationally I'd put in three plants to insure I had 100% coverage of 30MW all year long.