Re:Things I have learnt as the software engineering lead of ... by qq66 on Friday December 29, 2017 @12:41PM (#16030647)
And, plenty of surgeries are done in situations where speed matters more than the quality of the surgery (emergency tracheotomy, amputation, etc.)
Re:Things I have learnt as the software engineering lead of ... by dvt on Friday December 29, 2017 @02:51PM (#16031554)
Speed never matters more than the quality of the surgery. You're conflating constraints and criteria. Speed is sometimes a constraint, but never a criteria.
Re:Things I have learnt as the software engineering lead of ... by stefco_ on Friday December 29, 2017 @04:27PM (#16032106)
But speed is a self-imposed constraint on most projects rather than a physical law, meaning it might be violated. Furthermore, there might be a smooth relationship between speed of execution and value returned (even outside of cost of production). So when evaluating how successful a project was (software, surgery, or otherwise), you often do want to use speed as a criterion, even if you initially thought of it as a sort of constraint for the sake of simplifying planning.
Re:Things I have learnt as the software engineering lead of ... by brucephillips on Friday December 29, 2017 @04:07PM (#16031998)
Constraints are criteria.
Re:Things I have learnt as the software engineering lead of ... by dvt on Friday December 29, 2017 @05:13PM (#16032379)
No they aren't. Constraints are necessary but not sufficient. Criteria are necessary and sufficient. In other words, necessity is a lower bound and sufficiency is an upper bound. Criteria is the upper bound, constraints are the lower bound.

[1] https://www.sfu.ca/~swartz/conditions1.htm

Re:Things I have learnt as the software engineering lead of ... by brucephillips on Friday December 29, 2017 @05:22PM (#16032435)
You're also confusing an equality and a subset relationship.
Re:Things I have learnt as the software engineering lead of ... by zbentley on Friday December 29, 2017 @04:37PM (#16032166)
No, they're not.

If you violate a constraint, delivery fails. If you pass it, delivery does not necessarily succeed.

If you fail to meet a criterion, delivery might fail. If you successfully meet all criteria, this is the definition of successful delivery.

Different places may assign different meanings to those terms in project-management speak, but those are the ones I've heard the most.

Re:Things I have learnt as the software engineering lead of ... by brucephillips on Friday December 29, 2017 @04:51PM (#16032258)
You're confusing an equality relationship and a subset relationship.