Re:Considering leaving job because of SCRUM
by quickthrower2 on Wednesday November 29, 2017 @04:56PM
(#15811237)
Add:
I think the breaking up of the 12 weeks into chunks is a good practice so you can measure progress, and have discussions about removing bits if you blow up on time.
However if 1 dev is doing this work they can do it on their own rhythm - maybe releasing 3 things in one week and nothing for 3 weeks. There is no need to synchronize with the team.
I think the breaking up of the 12 weeks into chunks is a good practice so you can measure progress, and have discussions about removing bits if you blow up on time.
However if 1 dev is doing this work they can do it on their own rhythm - maybe releasing 3 things in one week and nothing for 3 weeks. There is no need to synchronize with the team.