I know of several cases where entire DCs were destroyed, and production continued unabated.
There are commercial platforms that are explicitly designed for this sort of DC redundancy over 800+ km spans. Where you have 400 km between various volumes in your RAIDset.
A moderately technical article on some of the issues that arise, and (for your question) see the end of the following:
http://h71000.www7.hp.com/openvms/journal/v1/disastertol.pdf
"At 2 a.m. on Dec. 29, 1999, an active stock market trading day, the audio alert on a UPS system alarmed a security guard on his first day on the job. He pressed the emergency power-off switch, taking down the entire datacenter. Because a disaster-tolerant OpenVMS cluster was in place, the cluster continued to run at the opposite site, with no disruption. The brokerage ran through that stock-trading day on the one site alone, and performed a shadow full-copy operation to restore redundancy in the evening, after trading hours. They procured a replacement for the failed security guard by the next day."
The last sentence.
I would think they'd keep the power systems under lock and key, or at least under the control of someone who knew what to do when a UPS starts making noise.
Emergency Power Off buttons are often required by code to shut down breakers and UPS.
I've heard that this is to prevent loss of life if a tech grabs a livewire and/or let the fire department know that power is removed before they start spraying water.