Re:Oroville Dam: Cost to repair spillways nearly doubles in ...
by DrScump on Saturday October 21, 2017 @11:27PM
(#15525027)
Case in point #2: the new Bay Bridge.
Case in point #0: the Space Shuttle (STS).
Re:Oroville Dam: Cost to repair spillways nearly doubles in ...
by JumpCrisscross on Saturday October 21, 2017 @11:30PM
(#15525030)
Sorry, you're citing the Space Shuttle [1] as a successful public procurement process?
[1] https://www.nasa.gov/pdf/382045main_19%20-%2020090730.11.STS...
Re:Oroville Dam: Cost to repair spillways nearly doubles in ...
by DrScump on Saturday October 21, 2017 @11:56PM
(#15525092)
No, my cites relate to the parent comment:
Cost plus percentage gives a very clear incentive to raise costs
Compare the original winning bid for the STS with the actual costs; I think they rose more than tenfold (and the per-flight cost rose more than that), IIRC.And had the competing team won, the Challenger disaster never would have happened, because the solid-rocket boosters would have been manufactured as units and transported to the Cape by barge rather than having to be broken into small enough components to fit on rail cars.
Case in point: SpaceX challenging the launch industry's cost-plus culture with publicly-posted fixed prices [1].
[1] http://www.spacex.com/about/capabilities