Not the case in the UK at all.
Up to 4Kw the power distributor has to accept your connection and it is done on a post reporting basis. Over 4Kw you fill in a form and get generator permission from the distributor. I got mine in a few weeks.
Once it is grid connected, then the inverters isolate if they lose grid power. Since the UK has fairly good grid connections that rarely if ever happens.
Never a problem - except for the guns and butter brigade. Fortunately most of those who were that way inclined moved to the Americas 100 years or so ago.
If you have a completely segregated solar installation no one cares.