Re:ThyssenKrupp Multi – world’s first rope-free elevator [vi...
by masklinn on Saturday August 05, 2017 @01:35PM
(#14936821)
At this point you start doing locals (multiple elevators per shaft traversing only a subset of the entire building) and express (elevators skipping floors, usually between ground floors and various "sky lobbies" at 30~40 floors interval).
[ Parent
| on HN ]
Re:ThyssenKrupp Multi – world’s first rope-free elevator [vi...
by JumpCrisscross on Saturday August 05, 2017 @01:47PM
(#14936880)
Which still involves adding shafts.