Re:Monolith First (2015)
by ris on Sunday July 16, 2017 @12:52PM
(#14782849)
> Having distinct silos of activity/responsibility, separate teams and communications channels; all can make a large project more manageable than the monolith by allowing the lower level problems to be abstracted away (from a management perspective).
It also has the effect of making small projects large even if they never needed to be in the first place (which of course looks great on a resume)
It also has the effect of making small projects large even if they never needed to be in the first place (which of course looks great on a resume)