Re:Cooling the tube – Engineering heat out of the Underground by mrec on Saturday June 24, 2017 @07:27AM (#14625226)
> indeed, the use of regenerative braking now converts about half the heat loss back into electricity. However, that can only work where trains are accelerating and braking at the same time, on the same electricity sub-station loop.

Besides that, Tube tracks often rise slightly at stations, so that trains get a small gravity assist to both stopping and starting off again. (Unfortunately it also means that hot air from the tunnels tends to collect there, but you can't win 'em all.)

Re:Cooling the tube – Engineering heat out of the Underground by flai on Saturday June 24, 2017 @07:39AM (#14625263)
That is a pretty cool way to implement regenerative breaking that I honestly never thought of (even though the tram in my hometown feeds energy in the grid when driving downwards)