I can understand a strong emphasis on quality for an air traffic control system and am glad that there was more weight put on getting out quality code than meeting a deadline (especially with some companies interpretations of DevOps/CI/CD). I'm curious what sort of defect penetration did you get once you got to the test bench?
I've had lines of code go through walk-throughs, inspections, paired programming, the works, and still end up failing somewhere down the line in integration testing.
The next company I worked at was very serious about quality. When I started working there, I was told that I was allowed one bug in my code. If there were a second one, I would be fired. I'm not sure if that was true as my code didn't have any (found) bugs. It was thoroughly inspected by two senior engineers before I could even run it on the test bench. We were some months behind schedule but there was not one word about reducing the quality to catch up.
The first company made communications equipment, the second one an air traffic control system.