Re:The Boring Company FAQ
by tpurves on Wednesday May 17, 2017 @12:07PM
(#14359826)
"- Soil variability. Very different techniques are required for different soils. Sometimes the soil has to be "conditioned", adding something to make it solid enough it can be drilled through.[1] This is the biggest practical problem in tunneling. Too much water is the usual problem."
Too much water won't be a problem on Mars... where I think the end-game here is for Musk on why he's learning how to build tunneling machines.
Re:The Boring Company FAQ
by Animats on Wednesday May 17, 2017 @12:11PM
(#14359865)
Fine, dry sand is also a problem. It leads to "over-excavating"; you keep digging and removing material as more slides down. You either get a big unwanted cavern that has to be supported, or break through to the surface.
Too much water won't be a problem on Mars... where I think the end-game here is for Musk on why he's learning how to build tunneling machines.