News for hackers. Stuff that matters.
Re:The Boring Company FAQ by avn2109 on Tuesday May 16, 2017 @11:47PM (#14355495)
Many TBM's are already nuclear powered, in that the grid power they consume was generated in a reactor somewhere. There is no reason to bring the reactor closer to the dig site.

Also, see e.g. https://en.wikipedia.org/wiki/The_Core for prior art /s

Re:The Boring Company FAQ by gosheroo on Wednesday May 17, 2017 @12:05AM (#14355564)
Using the grid there must be a lot of transformers and cabling involved. Plus with massive amounts of power in situ one might be able to process the waste rock differently (e.g. if it's looser material with fissures, compress it against the sides of the tunnel or perhaps even melt it rather than removing it. Admittedly I'm rather ignorant of soil and rock physics.)
Re:The Boring Company FAQ by resf on Wednesday May 17, 2017 @01:57AM (#14355996)
Nuclear reactors require a heatsink, usually a large amount of water.

If you put a nuclear reactor underground, you have to pump water back up. This takes a lot of energy. Whereas, electrical energy travelling through cables is not affected by gravity.

Re:The Boring Company FAQ by gosheroo on Wednesday May 17, 2017 @03:05AM (#14356244)
What if you used the heat to melt rock?