Are you being serious? In terms of known capabilities the Kola borehole shows that even with older tech we can drill down to over 12km in depth, and there have been decades [1,2,3] of efforts drill all the way through the Mohorovičić discontinuity into the mantle (20+km minimum from a continental starting point, 5-10+km from ocean). Lithosphere/mantle boundary tends to be defined by temperature, in that around 1800°F is when the weakest common mineral (olivine) begins to exhibit viscosity. Well before that it'd reach the point where the amount of pressurized water we could pump through it wouldn't be able to keep up with new thermal load. So yeah, at some depth the rock is always extremely hot.
In terms of economics though of course there is some set of balance points for a given level of tech and economics between cost of drilling to a given depth, gains in lifetime/power density, maintenance costs, costs/losses of actually moving working fluid from heat point to generator, reliability advantages, etc etc. Presumably experts go through and consider all of this, it should be tractable within some set of risk bars. If an experienced power company is actually putting down millions on doing a project after evaluation, I see no reason to doubt that they've done the math to their/their investors' satisfaction to a level sufficient for a pilot project.
1. http://www.smithsonianmag.com/science-nature/decades-long-qu...
2. https://en.wikipedia.org/wiki/Chiky%C5%AB
3. https://www.extremetech.com/extreme/247370-drill-baby-drill-...
I don't know what the Mohorovičić discontinuity is, but I'm sure it doesn't change this physics fact.
Not if you keep pumping in water to run a steam turbine.
I assume that's how geothermal energy works, and I'm not going to double check.