Re:The Boring Company [video]
by pjc50 on Saturday April 29, 2017 @05:35AM
(#14225758)
Ultimately you want to put passengers in the tunnel, yes?
[ Parent
| on HN ]
From parent comment, I was guessing that the point of greatest risk would be during tunneling / initial bracing? Rather than final static bracing.
I was thinking of the NATM failures: http://www.tunneltalk.com/images/laneCoveCollapse/Ref5-Heath...
(which were during construction, but happened in "finished" sections, I believe. NATM applies a single pass of shotcrete to the cut rock surface)