Re:New Bridges Rise in New York by tropo on Thursday April 27, 2017 @09:52PM (#14216352)
You forgot trains. Suspension bridges can't handle trains well.

What about buckling though? With all that force from the cables pulling the bridge deck toward the towers, it seems like a bit of unexpected bending or weakness (breeze, earthquake, minor damage) could cause the deck to travel inward to the tower while being crushed.

I do have to agree that I am tired of cable-stay bridges. They are a distant third for looks, behind suspension and obviously the stone arch. More stone arches please! Do a big one, a mile or two in height.

Re:New Bridges Rise in New York by arjunvpaul on Friday April 28, 2017 @01:09AM (#14216993)
Good point about trains. But I know one of the first suspension bridges did carry trains. https://en.m.wikipedia.org/wiki/Niagara_Falls_Suspension_Bri... .When we bid for the Tappan Zee bridge, the community wanted us to design it to take trains in the future. (Our team did not get the project) . Not sure how the executed design turned out.

Actually there is very little stress on the cables. The cables are stressed just enough to take the sag out of em. i.e. All the cables are actually supporting is their self weight! All you need is a hand-held jack and a lot of clever math, to install them :-).

The deck on one side of the tower is held in place by counter weight of the deck on the other side.

About earthquakes, it's designed for those 100 year quakes, hurricanes and floods. When we were building the Audubon Bridge across the Mississippi River, we were in fact hit by a 100-year flood and 2 hurricanes. Other than some stored material floating away and having to watch out for alligators in odd places. We got through fine :-)

The bridge type is rarely chosen for beauty :-) especially when contractors have to bid competitively for tonget a chance to build them. Governing factors are technical feasibility (design and constructability) and cost.

Re:New Bridges Rise in New York by icebraining on Saturday April 29, 2017 @03:11AM (#14225421)
You mentioned the Golden Gate - in Lisbon, we actually have a very similar suspension bridge, but ours does have a train running underneath it, added years later after construction. Supposedly, it was the first aerial spinning of additional main cables on a loaded, fully operational suspension bridge.

https://static.noticiasaominuto.com/stockimages/1370x587/nao...

Re:New Bridges Rise in New York by arjunvpaul on Saturday April 29, 2017 @03:21AM (#14225453)
Very cool! Now I know it may be possible to add trains to existing bridges :-). Thanks for the link.
Re:New Bridges Rise in New York by icebraining on Saturday April 29, 2017 @03:33AM (#14225480)
Found a video of the company adding the extra cables: https://vimeo.com/45236687
Re:New Bridges Rise in New York by Fifer82 on Sunday April 30, 2017 @02:40PM (#14233143)
I can't believe how much I am enjoying seeing engineers speaking in regular chat about such large projects. I thoroughly enjoyed this thread. Appreciate the sharing.