>..."not typically included in levelised cost of electricity assessments is the cost of decommissioning a reactor and disposing nuclear waste
Maybe in other countries, but not the US. Every nuclear power plant in the United States is required, by the Nuclear Regulatory Commission as part of its licensing to set aside sufficient funds to decommission the plant when it reaches the end of its useful life.
>...(The USA is an exception, because the cost of decommissioning is included in the price of electricity, per the Nuclear Waste Policy Act),
Also there is a tax on electricity produced by nuclear power in the US to cover eventual long term waste disposal so it is priced into the cost - though ideally this high level waste will eventually be burned in a 4th gen reactor so the volume of waste will be a small fraction of what it would otherwise be.
https://c1cleantechnicacom-wpengine.netdna-ssl.com/files/201...
Also:
"not typically included in levelised cost of electricity assessments is the cost of decommissioning a reactor and disposing nuclear waste, says Roula Inglesi-Lotz an energy economist and associate professor at the University of Pretoria. This would further increase the price of nuclear energy. Even when these costs are not included in calculations, the cost of nuclear investment remains high."
https://africacheck.org/reports/is-nuclear-energy-really-the...