Re:Ask HN: Why do I lose interest in every project after 6 m... by patio11 on Saturday May 22, 2010 @11:24AM (#1370448)
Could it be a fear of success? Or of stretching outside of your comfort zone? Or of the long stretch of hard work after the bloom is off the rose?

You're better informed about your psyche than I am, but I suggest pacing yourself, staying grounded to the other things in life which matter to you in addition to this startup, and carrying it through to completion.

Re:Ask HN: Why do I lose interest in every project after 6 m... by bdickason on Saturday May 22, 2010 @11:29AM (#1370454)
I don't know if it's fear of success, but I think the stretch of hard work is a good one. Perhaps it's also a result of an unrealistic roadmap?

i.e. I want A, B, and C to happen in X amount of time (hoping i can use that description w/ all the nerds here) and we're barely scratching the surface of A.

I think that accepting that it take 6 months to get anything decent STARTED is a good place to start :)

Re:Ask HN: Why do I lose interest in every project after 6 m... by gruseom on Saturday May 22, 2010 @01:04PM (#1370638)
I want A, B, and C to happen in X amount of time

Perhaps this is your problem. If A, B, and C haven't happened by X, then what? I'd examine my reaction there if I were you. If you're doing something purely as a means to an end, and the end doesn't happen when you expected it to, then you're in trouble. I've found two things make a big difference here.

1. Do something that isn't just a stepping-stone to a desired goal, but which you also enjoy doing for its own sake. It's ok if there are extrinsic goals too, as long as they don't dominate.

2. Multiply your time frame by an order of magnitude. That is, accept that it may take 5 years to do anything worthwhile. It doesn't have to, of course, but psychologically the point is fundamental. If you're not ok with it, I'd try to find out why, since the answer to your question is probably in the vicinity.

Re:Ask HN: Why do I lose interest in every project after 6 m... by percept on Saturday May 22, 2010 @11:48AM (#1370485)
Maybe both?

How about breaking your large A, B, and C tasks down into much smaller ones (something I definitely need to do)? Then you can just work off your lists and check, check, check without a lot of mental thrashing about.

This would also help with setting a more realistic schedule.